![shelolab SRI21D Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/shelolab/sri21d/sri21d_installation-and-operation-manual_1255384016.webp)
16 |
P a g e
INSTALLATION
I
NSTALL THE
C
HAMBER IN
L
OCATION
Install the unit in a workspace location that meets the criteria discussed in the previous entries of the
Installation section.
L
EVELING
The unit must be level and stable for safe operation. Ensure that the chamber is placed on a flat and
level surface, prior to placing the unit in operation.
A
TTACH THE
C
HAMBER
D
OOR
H
ANDLE
Attach provided the door handle to the chamber door.
•
Use the instructions packaged with the handle.
Содержание SRI21D
Страница 1: ...DIURNAL PLANT GROWTH CHAMBER 115 Voltage Installation Operation Manual SRI21D ...
Страница 8: ...8 P a g e INTRODUCTION ...
Страница 12: ...12 P a g e RECEIVING YOUR UNIT ...
Страница 20: ...20 P a g e GRAPHIC SYMBOLS ...