![shelolab SRI21D Скачать руководство пользователя страница 45](http://html.mh-extra.com/html/shelolab/sri21d/sri21d_installation-and-operation-manual_1255384045.webp)
45 |
P a g e
USER MAINTENANCE
Turning Off the Automatic Defrost
Deactivating the defrost thermostat will result in ice accumulation and a gradual
loss of cooling efficiency. Incubators used for BOD and other closed-container
applications with the defrost thermostat turned off will likely require manual
defrosting every 6 months. Units with open sources of water evaporation and
the defrost thermostat shut off will require manual defrosting every 2 to 3
months. The exact interval depends on the environmental humidity,
temperature setting, and the amount of evaporation taking place inside the
incubation chamber.
Manual Defrosting
Carryout the following steps to manually defrost the unit:
1.
Unplug the incubator, open the chamber door, and allow the unit to stand undisturbed with
the door open for 24 hours.
2.
Wipe up any condensate that forms in the chamber as well as any water around the
incubator after 24 hours have elapsed.
3.
Close the chamber door, plug the incubator power cord into the wall power source, and
place the unit back into operation.
The Low Set Limit Dial (Avoiding Freezing Temps)
The chamber comes with a low set limit system control, set at the factory to turn
off the refrigeration compressor when the incubator air temperature falls to just
above 0°C. This is intended to prevent the incubator from reaching or falling
below the freezing point. Freezing and sub-freezing temperatures risk
damaging plant samples and as well as fluid-filled BOD sample containers.
Under most circumstances, the low set limit system should not be
adjusted. If you wish to adjust the limit setting, please contact
Technical
Support
(page 6).
The manufacturing defect warranty does not cover
damage
to the unit or samples by freezing or subfreezing temperatures if
the low set limit has been set to 0°C or lower than 0°C.
The unit is not
intended to be operated at freezing or sub-freezing temperatures.
Figure 13: Defrost Cycle
Switch – Top Left of Unit,
Back side
Figure 14: Low Set Limit
Dial (Bottom Left of Unit,
Back)
Содержание SRI21D
Страница 1: ...DIURNAL PLANT GROWTH CHAMBER 115 Voltage Installation Operation Manual SRI21D ...
Страница 8: ...8 P a g e INTRODUCTION ...
Страница 12: ...12 P a g e RECEIVING YOUR UNIT ...
Страница 20: ...20 P a g e GRAPHIC SYMBOLS ...