![shelolab SRI21D Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/shelolab/sri21d/sri21d_installation-and-operation-manual_1255384034.webp)
34 |
P a g e
OPERATION
Procedure continued on next page
Programming the day phase parameters
7.
Save the day phase start hour and scroll to the day phase start minute
page.
a.
Press the
Advance button
once to save the hour setting
and
advance to the minute page.
•
“Mi2” is the day phase start minute.
Initial Day Phase Start Minute
8.
Set the day phase start minute.
a.
Use the
Up
and
Down Arrow
keys adjust the day minute (30
minutes in this example).
Adjusted Day Phase Start
Minute
9.
Save the day start minute setting and scroll to the day phase temperature
set point.
a.
Press the
Advance button
once to save the minute setting
and advance to the day temperature set point page.
•
“t.SP3” indicates that this is a temperature set point page
reserved for the day.
Initial Day Phase Temp. Set
Point
10.
Set the day phase temperature set point.
a.
Use the
Arrow keys
to adjust to the day set point.
Adjusted Day Phase Temp.
Set Point
Содержание SRI21D
Страница 1: ...DIURNAL PLANT GROWTH CHAMBER 115 Voltage Installation Operation Manual SRI21D ...
Страница 8: ...8 P a g e INTRODUCTION ...
Страница 12: ...12 P a g e RECEIVING YOUR UNIT ...
Страница 20: ...20 P a g e GRAPHIC SYMBOLS ...