OPERATION
P
UT THE
C
HAMBER INTO
O
PERATION
Perform the following steps and procedures each time the chamber is installed in a new workspace
environment. Requires approximately 9 hours.
1.
Verify that all the procedures in the Installation section of this manual have been performed.
2.
Plug the unit power cord into the workspace supply outlet (power socket).
3.
Place the
Power
switch in the ON ( I ) position.
a.
The controller display will illuminate and show its home page, with the last
programed temperature set point. The unit comes from the factory set to run in
its manual night mode with a set point of 20°C.
4.
Set the Over Temperature Limit control dial is in its maximum position. This prevents the OTL
system from interfering with setting up temperature operations.
5.
Perform the following procedures in the Operation section to finish preparing the chamber:
Set the Day Mode Temperature Set Point
page 26
Set the Night Mode Temperature Set Point
page 29
Program Clock Times and Auto Cycle Temperature Set Points
page 32
Optional
: If you are required to verify the accuracy of the chamber temperature
display, set up the verification equipment now. See the suggested calibration setup
and the first two steps of the suggested calibration procedures on pages 46 - 48
and page 52.
Required
: Allow the chamber to operate undisturbed in a manual mode for 8 hours
to thermally stabilize before loading samples or calibrating.
Load the Chamber
page 38
Optional:
Launch the Day – Night Auto Cycle
page 39
Set the Over Temperature Limit
page 40
Содержание SRI21D
Страница 1: ...DIURNAL PLANT GROWTH CHAMBER 115 Voltage Installation Operation Manual SRI21D ...
Страница 8: ...8 P a g e INTRODUCTION ...
Страница 12: ...12 P a g e RECEIVING YOUR UNIT ...
Страница 20: ...20 P a g e GRAPHIC SYMBOLS ...