
Installation manual of system “bp408” - The control system “bp408”
49
5.7.12
Easy servicing thanks to clear structure
The cable channel is wired on the base plate according to industrial standard. A
cable wiring channel serves as manoeuvring room for incoming lines. All terminals
of the processor are led to a separate terminal block at the bottom of the control
cabinet. The control system is installed on a galvanised assembly plate. The sizes
and dimensions stated here are applicable to a standard design of lifts with eight
or more hall call points and with main drive power up to maximum 15 kW. We
supply higher power on request.
Содержание bp408
Страница 2: ......
Страница 24: ...24 Installation manual of system bp408 Safety instructions...
Страница 52: ...52 Installation manual of system bp408 The control system bp408...
Страница 58: ...58 Installation manual of system bp408 Installation and assembly...
Страница 80: ...80 Installation manual of system bp408 Electrical connection...
Страница 118: ...Installation manual of system bp408 Appendix 118 Appendix A Menu navigation bp408...
Страница 119: ...119 Installation manual of system bp408 Appendix B Update of the firmware via USB stick...