GUI reference
R&S
®
ZNB/ZNBT
723
User Manual 1173.9163.02 ─ 62
Step 2: calibration settings
Defines power settings that apply to all subsequent calibrations and allows you to
select some optional calibration steps.
Step 3: ports and calibration types
In step 3 the "Guided Calibration" wizards excutes the calibration parts of a set of stan-
dard calibration wizards for system error correction and power calibration.
During the calibration phase, a progress bar below the active calibration wizard's dock
widget indicates the overall progress of the guided calibration.
After all required calibration steps were performed, the "Guided Calibration" wizards
asks you to connect your DUT to the VNA as you have specified in the "DUT/VNA
Connections step".
RF power will be switched off for all ports until you proceed with "OK", which will termi-
nate the "Guided Calibration" wizard.
If you cancel one of those wizards, you are asked if you want to skip just the current
calibration, or end the guided calibration as a whole.
Applic softtool