Pratt & Whitney Rzeszów S.A.
MAINTENANCE MANUAL
PZL-10W ENGINE
1992.08.28
77-02-00
Page 15
Export Control Classification: PL/UE 9E999
M.
Th e s i g n a l li n g o f t h e a i r b l e e d va l ve f r o m b e h i nd c o m p r e s s o r V I -t h s t ag e
o p e n i n g.
(1)
S i g n a ll i n g d e vi c e ( p i c k u p )
( a )
Typ e
MC TB - 0 , 1 A
( b )
Qu a n t i t y
1
( c )
I n s t al l a ti o n p la c e
o n t h e e ng i n e
( s e e 7 2 - 02 - 0 0 ,
DE S CRI P TI O N A ND O P E RA TI ON,
D wg 2 , i l e m 2 2 )
( 2 )
S i g n a l la m p
( a )
De s i g na t i o n
E NG 1 A I R B L E E D
o r
E NG 2 A I R B L E E D
( b )
Co l o r
g r e e n
The signalling system switches on when the air bleed valve from behind compressor Vl-th stage is opened and the
air flows through the opening to the atmosphere
N.
The signalling of the icing protection system opening.
(1)
Signalling device (pick-up)
(a)
Type
MCTB-0,5AC
(b)
Quantity
1
(c)
Installation place
on the engine
(see 72-02-00,
DESCRIPTION AND OPERATION,
Dwg 2, ilem 22)
( 2 ) S i g n a l l a m p
( a )
De s i g na t i o n
E NG 1 A N TI I CI NG ON
o r
E NG 2 A N TI I CI NG ON
( b )
Co l o r
g r e e n
The signalling system switches on when the icing protection system valve is opened and the hot air flows to the icing
protection system of the engine.