
Pratt & Whitney Rzeszów S.A.
MAINTENANCE MANUAL
PZL-10W ENGINE
1992.08.28
77-02-00
Page 403
Export Control Classification: PL/UE 9E999
1.
Plug nut
2
Signalling device (pick-up)
3.
Bracket
4.
Washer
5
Nut
6
Pipe with washer
Removal and installation of the MCTB-1,1A and MCTB-0,1A signalling devices.
Dwg 401