Pratt & Whitney Rzeszów S.A.
MAINTENANCE MANUAL
PZL-10W ENGINE
1992.08.28
73
Table of Contents
Page 3
Export Control Classification: PL/UE 9E999
FUEL METERING PUMP - REMOVAL AND INSTALLATION
73-22-01
401
1.
Removal and installation of the fuel metering pump
401
A.
Removal of the fuel metering pump
401
B.
Installation of the fuel metering pump
402
FUEL METERING PUMP - CLEANING AND PAINTING
73-22-01
701
1.
Inspection and washing of the fuel coarse filter
of the fuel metering pump
701
2.
Inspection and washing of the fuelfine filter
of the fuel metering pump
702
ROTATIONAL SPEED LIMITER OF THE POW ER TURBINE -
DESCRIPTION AND OPERATION
73-22-02
1
1. Description and operation
1
A.
General information
1
B.
Operation of the power turbine rotational speed limiter
1
C.
Description and operation of the assemblies
of the power turbine rotational speed limiter
3
ROTATIONAL SPEED LIMITER OF THE POW ER TURBINE -
REMOVAL AND INSTALLATION
73-22-02
401
1.
Removal and installation of the power turbine rotational
speed limiter
401
A.
Removal of the power turbine rotational speed limiter
401
B.
Installation of the power turbine rotational speed limiter
401
ELECTRONIC LIMITER UNIT DESCRIPTION AND OPE RA TI ON
73-22-03
1
1.
Description
1
A.
General information
1
B.
Structure
2
2.
Operation
2
A.
Feeder unit
2
B.
Measuring and controlling circuits
2