Using OmniStream
™
with Velocity
™
Device Manager
142
5. The
LINK TEST
button will be hidden and an animated icon will appear, indicating that the link test is in progress.
6.
After the link test has completed, the
LINK TEST
button will be displayed.
7. Click
NOTIFICATIONS
in the menu bar to review the test results.
Appendix
If the test passed, information similar to the following will be displayed: “100% of packets received by ...”
indicates no packets were dropped / zero loss.
If the test fails, it could be that less than 100% of packets are received, indicating connectivity, but with some
amount of packet loss. If it shows “No one replied!” or if the target decoder is not shown in results, it could
indicate that there is a connectivity issue or that the decoder is not subscribed to the correct video multicast
address.
8.
Click the
CLEAR
button to remove the test results from the
NOTIFICATIONS
page.