Step
Perform on each controller
Cable cluster interconnect ports:
• Slot A4 and B4 (e4a)
• Slot A8 and B8 (e8a)
Cable controller management (wrench) ports.
Cable 32 Gb FC network switches:
Ports in slot A3 and B3 (e3a and e3c)
and slot A9 and B9 (e9a and e9c) to the
32 Gb FC network switches.
40GbE host network switches:
Cable host
‐
side b ports in slot A4 and
B4 (e4b) and slot A8 and B8 (e8b) to
the host switch.
Cable 25 GbE connections:
Cable ports in slot A5 and B5 (5a,
5b, 5c, and 5d) and slot A7 and B7
(7a, 7b, 7c, and 7d) to the
25 GbE network switches.
2. Connect the power cables to the PSUs
and connect them to different power sources (not shown).
3. Strap the cables to the cable
management arms (not shown).
4. To cable your storage, see
Step 4: Cable controllers to drive shelves
.
Option 2: Switched cluster
Management network, data network, and management ports on the controllers are connected to switches.
The cluster interconnect and HA ports are cabled on to the cluster/HA switch.
Before you begin
You must have contacted your network administrator for information about connecting the system to the
switches.
689
Содержание FAS2600
Страница 24: ...7 Close the controller module cover and tighten the thumbscrew 22 ...
Страница 61: ...2 Close the controller module cover and tighten the thumbscrew 59 ...
Страница 550: ...548 ...
Страница 660: ...Select one of the following options for instructions on how to reassign disks to the new controller 658 ...