Step 4: Reboot the controller after FRU replacement
After you replace the FRU, you must reboot the controller module.
Step
1. To boot ONTAP from the LOADER prompt, enter
bye
.
Step 5: Switch back aggregates in a two-node MetroCluster configuration
After you have completed the FRU replacement in a two-node MetroCluster configuration, you can perform the
MetroCluster switchback operation. This returns the configuration to its normal operating state, with the sync-
source storage virtual machines (SVMs) on the formerly impaired site now active and serving data from the
local disk pools.
This task only applies to two-node MetroCluster configurations.
Steps
1. Verify that all nodes are in the
enabled
state:
metrocluster node show
cluster_B::> metrocluster node show
DR Configuration DR
Group Cluster Node State Mirroring Mode
----- ------- -------------- -------------- ---------
--------------------
1 cluster_A
controller_A_1 configured enabled heal roots
completed
cluster_B
controller_B_1 configured enabled waiting for
switchback recovery
2 entries were displayed.
2. Verify that resynchronization is complete on all SVMs:
metrocluster vserver show
3. Verify that any automatic LIF migrations being performed by the healing operations were completed
successfully:
metrocluster check lif show
4. Perform the switchback by using the
metrocluster switchback
command from any node in the
surviving cluster.
5. Verify that the switchback operation has completed:
metrocluster show
The switchback operation is still running when a cluster is in the
waiting-for-switchback
state:
586
Содержание FAS2600
Страница 24: ...7 Close the controller module cover and tighten the thumbscrew 22 ...
Страница 61: ...2 Close the controller module cover and tighten the thumbscrew 59 ...
Страница 550: ...548 ...
Страница 660: ...Select one of the following options for instructions on how to reassign disks to the new controller 658 ...