![Mitsubishi Electric PUHY-(E)P300 Скачать руководство пользователя страница 236](http://html.mh-extra.com/html/mitsubishi-electric/puhy-e-p300/puhy-e-p300_service-handbook_1811161236.webp)
[
IX
Troubleshooting ]
- 227 -
HWE07010
GB
(2) Outdoor LEV (LEV1)
The valve opening changes according to the number of pulses.
1) Connections between the outdoor control board and LEV1 (outdoor expansion valve)
2) Pulse signal output and valve operation
3) LEV valve closing and opening operation
LEV
DC 12V
Outdoor control board
M
4
6
2
3
5
1
4
5
6
3
2
1
4
5
6
3
2
1
4
3
2
1
Red
Brown
Blue
Orange
Yellow
White
Drive circuit
1
2
3
4
5
6
7
8
1
ON OFF OFF OFF OFF OFF ON ON
2
ON ON ON OFF OFF OFF OFF OFF
3
OFF OFF ON ON ON OFF OFF OFF
4
OFF OFF OFF OFF ON ON ON OFF
Output pulses change in the following orders when the
Valve is open; 1 2 3 4 5 6 7 8 1
Valve is closed; 8 7 6 5 4 3 2 1 8
*1. When the LEV opening angle does not change,
all the output phases will be off.
*2. When the output is open phase or remains ON,
the motor cannot run smoothly, and rattles and vibrates.
Output
(phase)
number
Output state
*When the power is turned on, the valve closing signal of 520 pulses
will be output from the indoor board to LEV to fix the valve position.
It must be fixed at point A.
(Pulse signal is output for approximately 17 seconds.)
When the valve operates smoothly, there is no sound from the LEV and no
vibration occurs, but when the valve is locked, noise is generated.
*Whether a sound is generated or not can be determined by
holding a screwdriver against it, then placing your ear against the handle.
*If liquid refrigerant flows inside the LEV, the sound may become smaller.
B
A
Fully open: 480 pulses
Pulses
Valve opening (refrigerant flow rate)
Valve closed
Valve open
Содержание PUHY-(E)P300
Страница 9: ......
Страница 11: ... 2 ...
Страница 23: ... 14 ...
Страница 25: ... 16 ...
Страница 55: ... 46 ...
Страница 57: ... 48 ...
Страница 67: ... 58 ...
Страница 75: ... 66 ...
Страница 77: ... 68 ...
Страница 80: ... 71 HWE07010 GB VI Refrigerant Circuit 1 Refrigerant Circuit Diagram 73 2 Principal Parts and Functions 74 ...
Страница 81: ... 72 ...
Страница 87: ... 78 ...
Страница 89: ... 80 ...
Страница 113: ... 104 ...
Страница 115: ... 106 ...
Страница 163: ... 154 ...
Страница 255: ... 246 ...
Страница 256: ... 247 HWE07010 GB X LED Monitor Display on the Outdoor Unit Board 1 How to Read the LED on the Service Monitor 249 ...
Страница 257: ... 248 ...