14 - 16
14. CC-Link CONNECTION (Via G4)
14.5 PLC Side Settings
(2) Station information setting
: Necessary : As necessary : Not necessary
*1
When the [Mode] of the CC-Link module is set at [Remote
net - (Ver. 2 mode)], [Remote station points] can be set.
[Remote station points] is a setting for the remote I/O station.
The default value (32 points) must be used on the GOT.
*2
When the [Mode] of the CC-Link module is set at [Remote
net - (Ver. 2 mode)] or [Remote net - Additional mode], set to
[Ver. 1 Intelligent device station].
POINT
POINT
POINT
When changing the network parameter
After writing the network parameter to the PLC CPU,
operate the PLC CPU ether turning OFF and then ON
or resetting.
(3) Completion confirmation
After initial communications of CC-Link are completed,
the L RUN LED of AJ65BT-G4-S3 turns on.
The GOT starts to monitor after the L-RUN LED of
AJ65BT-G4-S3 turns on.
It does not monitor while the L RUN LED turns off.
14.5.5 Parameter setting (when
connecting to C Controller
module (Q Series))
Use SW3PVC-CCPU-E Ver.3.05F or later for the C
Controller module setting utility.
(1) Connection settings
: Necessary : As necessary : Not necessary
*1
If the IP address of the C Controller module (Q Series) has
been changed, input the changed IP address or host name.
*2
If the account of the C Controller module (Q Series) has
been changed, input the changed user name and password.
Item
*1
Set value
Setting necessity
at GOT connection
Station type
*2
Intelligent device
station (fixed)
Number of stations
occupied
Exclusive station 1 (fixed)
Reserve/invalid station
select
No setting
Intelligent buffer select
(word)
(Use default value)
PW
RUN
L RUN
SD
RD
L ERR.
Item
Set value
Setting
necessity
at GOT
connection
Target module
*1
192.168.3.3
Write authority
Mark the checkbox
User name
*2
target
Password
*2
password
Detailed settings
-
Содержание GT15
Страница 2: ......
Страница 34: ...A 32 ...
Страница 92: ......
Страница 110: ...2 18 2 DEVICE RANGE THAT CAN BE SET 2 9 MELSEC WS ...
Страница 134: ...3 24 3 ACCESS RANGE FOR MONITORING 3 7 Connection to the Head Module of CC Link IE Field Network System ...
Страница 186: ...5 10 5 BUS CONNECTION 5 2 System Configuration ...
Страница 218: ...5 42 5 BUS CONNECTION 5 4 Precautions ...
Страница 254: ...6 36 6 DIRECT CONNECTION TO CPU 6 6 Precautions ...
Страница 286: ...7 32 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Страница 350: ...8 64 8 ETHERNET CONNECTION 8 5 Precautions ...
Страница 368: ...9 18 9 MELSECNET H CONNECTION PLC TO PLC NETWORK 9 5 Precautions ...
Страница 420: ...11 26 11 CC Link IE CONTROLLER NETWORK CONNECTION 11 5 Precautions ...
Страница 440: ...12 20 12 CC Link IE FIELD NETWORK CONNECTION 12 5 Precautions ...
Страница 490: ...13 50 13 CC Link CONNECTION INTELLIGENT DEVICE STATION 13 5 Precautions ...
Страница 510: ......
Страница 564: ...15 54 15 INVERTER CONNECTION 15 7 Precautions ...
Страница 668: ......
Страница 712: ...21 12 21 MULTIPLE GT14 GT12 GT11 GT10 CONNECTION FUNCTION 21 5 Precautions ...
Страница 713: ...MULTI CHANNEL FUNCTION 22 MULTI CHANNEL FUNCTION 22 1 ...
Страница 714: ......
Страница 760: ...22 46 22 MULTI CHANNEL FUNCTION 22 5 Multi channel Function Check Sheet ...
Страница 761: ...FA TRANSPARENT FUNCTION 23 FA TRANSPARENT FUNCTION 23 1 ...
Страница 762: ......
Страница 860: ...REVISIONS 4 ...
Страница 863: ......