3 - 2
3. ACCESS RANGE FOR MONITORING
3.1 Access Range for Monitoring Stations on Network Systems
3.
ACCESS RANGE FOR MONITORING
3.1 Access Range for Monitoring Stations on Network
Systems
3.1.1
MELSECNET/H, MELSECNET/10, CC-Link IE Controller Network,
CC-Link IE Field Network
Bus connection
(1) When connecting to multiple CPU system
• The GOT can monitor the control station and all the normal stations on the
network.
• The GOT can monitor the control station and all the normal
stations on other networks.
(For monitoring stations on other networks, be sure to set the
routing parameter)
When the Universal model QCPU is used as a relay station, the
GOT can monitor stations with the station No.65 or later in the CC-
Link IE controller network.
• When connecting to the multiple CPU system, the GOT can
monitor CPU No.1 to No.4.
• Devices of other stations (other than devices B and W that are allocated by the network parameter) may not
allow monitoring depending on their PLC CPU.
■
Monitor accessible range of other stations and setting method of monitor devices (Examples 1
to 2)
• The motion controller CPU (Q Series) at other stations cannot be monitored.
*1
The control station and normal station correspond to the master station and local station in the CC-Link IE field network
respectively.
GOT
Normal
station
Normal
station
Normal
station
Control station
*1
GOT
Normal
station
Normal
station
Normal
station
Control station
Normal
station
Control
station
Normal
station
*1
GOT
Normal
station
Normal
station
Normal
station
Control station
Control
station
Normal
station
Normal station
Содержание GT15
Страница 2: ......
Страница 34: ...A 32 ...
Страница 92: ......
Страница 110: ...2 18 2 DEVICE RANGE THAT CAN BE SET 2 9 MELSEC WS ...
Страница 134: ...3 24 3 ACCESS RANGE FOR MONITORING 3 7 Connection to the Head Module of CC Link IE Field Network System ...
Страница 186: ...5 10 5 BUS CONNECTION 5 2 System Configuration ...
Страница 218: ...5 42 5 BUS CONNECTION 5 4 Precautions ...
Страница 254: ...6 36 6 DIRECT CONNECTION TO CPU 6 6 Precautions ...
Страница 286: ...7 32 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Страница 350: ...8 64 8 ETHERNET CONNECTION 8 5 Precautions ...
Страница 368: ...9 18 9 MELSECNET H CONNECTION PLC TO PLC NETWORK 9 5 Precautions ...
Страница 420: ...11 26 11 CC Link IE CONTROLLER NETWORK CONNECTION 11 5 Precautions ...
Страница 440: ...12 20 12 CC Link IE FIELD NETWORK CONNECTION 12 5 Precautions ...
Страница 490: ...13 50 13 CC Link CONNECTION INTELLIGENT DEVICE STATION 13 5 Precautions ...
Страница 510: ......
Страница 564: ...15 54 15 INVERTER CONNECTION 15 7 Precautions ...
Страница 668: ......
Страница 712: ...21 12 21 MULTIPLE GT14 GT12 GT11 GT10 CONNECTION FUNCTION 21 5 Precautions ...
Страница 713: ...MULTI CHANNEL FUNCTION 22 MULTI CHANNEL FUNCTION 22 1 ...
Страница 714: ......
Страница 760: ...22 46 22 MULTI CHANNEL FUNCTION 22 5 Multi channel Function Check Sheet ...
Страница 761: ...FA TRANSPARENT FUNCTION 23 FA TRANSPARENT FUNCTION 23 1 ...
Страница 762: ......
Страница 860: ...REVISIONS 4 ...
Страница 863: ......