8 - 50
8. ETHERNET CONNECTION
8.4 PLC Side Setting
(2) Operational settings
:Required :Set if necessary :Not required
*1
Because the port No. 5551 is fixed, the GOT oper-
ates as follows, regardless of the setting for the item.
• Communication date code : [Binary code]
• Initial timing : [Always wait for OPEN]
(Communications are enabled while the programmable
controller CPU stops.)
*2
The default value of IP address is 192.168.1.254. Set the IP
address corresponding to the system configuration.
POINT
POINT
POINT
When changing Ethernet parameter
After writing the Ethernet parameter to the
programmable controller CPU, turn off and then on, or
reset the programmable controller CPU.
(3) Open settings
:Required :Set if necessary :Not required
POINT
POINT
POINT
When connecting to multiple GOTs and peripheral
devices
The number of protocols equivalent to that of the GOTs
and devices must be set.
Item
Setting
Setting
(with GOT connected)
Communication
date code
*1
(Use default value.)
IP address
192.168.0.19
Initial timing
*1
(Use default value.)
Send frame setting
TCP Existence
confirmation setting
Item
Setting
Setting
(with GOT connected)
Protocol
TCP
Open system
MELSOFT connection
Fixed buffer
(Use default value.)
Fixed buffer communication
procedure
Pairing open
Existence confirmation
Host station Port No.
(DEC.)
Transmission target device
IP address
Transmission target device
Port No. (DEC.)
Содержание GT15
Страница 2: ......
Страница 34: ...A 32 ...
Страница 92: ......
Страница 110: ...2 18 2 DEVICE RANGE THAT CAN BE SET 2 9 MELSEC WS ...
Страница 134: ...3 24 3 ACCESS RANGE FOR MONITORING 3 7 Connection to the Head Module of CC Link IE Field Network System ...
Страница 186: ...5 10 5 BUS CONNECTION 5 2 System Configuration ...
Страница 218: ...5 42 5 BUS CONNECTION 5 4 Precautions ...
Страница 254: ...6 36 6 DIRECT CONNECTION TO CPU 6 6 Precautions ...
Страница 286: ...7 32 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Страница 350: ...8 64 8 ETHERNET CONNECTION 8 5 Precautions ...
Страница 368: ...9 18 9 MELSECNET H CONNECTION PLC TO PLC NETWORK 9 5 Precautions ...
Страница 420: ...11 26 11 CC Link IE CONTROLLER NETWORK CONNECTION 11 5 Precautions ...
Страница 440: ...12 20 12 CC Link IE FIELD NETWORK CONNECTION 12 5 Precautions ...
Страница 490: ...13 50 13 CC Link CONNECTION INTELLIGENT DEVICE STATION 13 5 Precautions ...
Страница 510: ......
Страница 564: ...15 54 15 INVERTER CONNECTION 15 7 Precautions ...
Страница 668: ......
Страница 712: ...21 12 21 MULTIPLE GT14 GT12 GT11 GT10 CONNECTION FUNCTION 21 5 Precautions ...
Страница 713: ...MULTI CHANNEL FUNCTION 22 MULTI CHANNEL FUNCTION 22 1 ...
Страница 714: ......
Страница 760: ...22 46 22 MULTI CHANNEL FUNCTION 22 5 Multi channel Function Check Sheet ...
Страница 761: ...FA TRANSPARENT FUNCTION 23 FA TRANSPARENT FUNCTION 23 1 ...
Страница 762: ......
Страница 860: ...REVISIONS 4 ...
Страница 863: ......