11 - 12
11. CC-Link IE CONTROLLER NETWORK CONNECTION
11.4 PLC Side Setting
(b) Network range assignment
: Necessary : As necessary : Not necessary
*1
Be sure to set it to perform the cyclic transmission.
POINT
POINT
POINT
When changing the unit parameter
After writing unit parameters to the PLC CPU, turn the
PLC CPU OFF then back ON again, or reset the PLC
CPU.
(c) Routing setting
Up to 64 [Target Network No.]s can be set.
However, the same transfer network number
cannot be set twice or more (multiple times).
Therefore, the one that can access to other station
from the request source host GOT is 64 kinds of
[Target Network No.]s.
POINT
POINT
POINT
Routing parameter setting of request source
Routing parameter setting is also necessary for the
request source GOT.
For the setting, refer to the following.
11.3.3 Routing parameter setting
Item
Set value
Setting
necessity at
GOT
connection
LB/LW
Setting
(1)*1
LB
Station
No.1
Start
0000
H
End
00FF
H
Station
No.2
Start
0100
H
End
01FF
H
LW
Station
No.1
Start
00000
H
End
000FF
H
Station
No.2
Start
00100
H
End
001FF
H
LB/LW Setting (2)
*1
No Setting
LX/LY Setting (1)
*1
No Setting
LX/LY Setting (2)
*1
No Setting
Reserved Station
(Use default value)
Pairing
Item
Range
Target Network No.
1 to 239
Relay Network No.
1 to 239
Relay Station No.
1 to 120
Содержание GT15
Страница 2: ......
Страница 34: ...A 32 ...
Страница 92: ......
Страница 110: ...2 18 2 DEVICE RANGE THAT CAN BE SET 2 9 MELSEC WS ...
Страница 134: ...3 24 3 ACCESS RANGE FOR MONITORING 3 7 Connection to the Head Module of CC Link IE Field Network System ...
Страница 186: ...5 10 5 BUS CONNECTION 5 2 System Configuration ...
Страница 218: ...5 42 5 BUS CONNECTION 5 4 Precautions ...
Страница 254: ...6 36 6 DIRECT CONNECTION TO CPU 6 6 Precautions ...
Страница 286: ...7 32 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Страница 350: ...8 64 8 ETHERNET CONNECTION 8 5 Precautions ...
Страница 368: ...9 18 9 MELSECNET H CONNECTION PLC TO PLC NETWORK 9 5 Precautions ...
Страница 420: ...11 26 11 CC Link IE CONTROLLER NETWORK CONNECTION 11 5 Precautions ...
Страница 440: ...12 20 12 CC Link IE FIELD NETWORK CONNECTION 12 5 Precautions ...
Страница 490: ...13 50 13 CC Link CONNECTION INTELLIGENT DEVICE STATION 13 5 Precautions ...
Страница 510: ......
Страница 564: ...15 54 15 INVERTER CONNECTION 15 7 Precautions ...
Страница 668: ......
Страница 712: ...21 12 21 MULTIPLE GT14 GT12 GT11 GT10 CONNECTION FUNCTION 21 5 Precautions ...
Страница 713: ...MULTI CHANNEL FUNCTION 22 MULTI CHANNEL FUNCTION 22 1 ...
Страница 714: ......
Страница 760: ...22 46 22 MULTI CHANNEL FUNCTION 22 5 Multi channel Function Check Sheet ...
Страница 761: ...FA TRANSPARENT FUNCTION 23 FA TRANSPARENT FUNCTION 23 1 ...
Страница 762: ......
Страница 860: ...REVISIONS 4 ...
Страница 863: ......