5
Installation
PAD-V
INSTRUCTION
MANUAL
MITA-PAD-V-MAN-IT-
201812
© MITA Cooling Technologies
S.r.l.
36 / 59
5.5.2 Secondary plumbing circuit connection (water supply and drain)
• Wetting water replenishment, to be connected to the water mains for first filling and for making up
the water used for adiabatic cooling.
• Water drain and overflow: to be connected to the drainage network for eliminating water in the
refreshing cycles or any surplus water inside the collection basins.
• Basin emptying: to be connected to the drainage network for totally emptying the water collection
tanks and avoid stagnation over the winter season.
All the connections above are threaded gas; on request, different types of connections
can be supplied.
Figure 10
–PAD-V inlet and outlet connections
IN
OUT