Connecting up to the power supply
42
10.2.2 Cable routing
Reroute cables after dismantling the casing or other system components.
Electric shock
Isolate the entire heating system from the power supply
before starting work on the pellet boiler.
Note the following points to ensure the cables are routed securely:
Cables must not be routed:
• over moving parts,
• over hot parts,
• or over sharp edges.
Cables must be:
• routed in the cable ducts provided and
• through cable leadthroughs,
• tied together,
• and secured with cable ties at the points provided.
• Power cables must be routed in the right-hand duct and sensor cables must be routed in the left-hand duct.
Electric shock
Check cables for damage.
Replace any cables that are damaged.
Damage to the boiler controller
Before fitting the casing components, make sure that the
cable plug connector codes match the socket codes.
Installation Manual PES 36–56
PE 3671 USA 2.3
Содержание Pellematic PES 12-20
Страница 38: ...Connecting up to the power supply 38 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 46: ...Connecting up to the power supply 46 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 47: ...Connecting up to the power supply 47 PE 3671 USA 2 3 Installation Manual PES 36 56...
Страница 52: ...Operating the pellet boiler 52 Setting date and time Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 88: ...Appendix 88 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 92: ...Appendix 92 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 99: ...Appendix 99 Labeling 105x74 PE 3671 USA 2 3 Installation Manual PES 36 56...
Страница 100: ......