Bringing the pellet boiler into the boiler room
21
Boiler size
PE(S)
12
PE(S)
15
PE(S)
20
PE(S)
25
PE(S)
32
PE(S)
36
PE(S)
48
PE(S)
56
B
– Overall width of pellet boiler
in
44 1/2
44 1/2
44 1/2
46 3/4
46 3/4
51
51
51
C
– Width of boiler casing
in
27 1/2
27 1/2
27 1/2
29 3/4
29 3/4
34
34
34
H
– Height of boiler casing
in
43
43
43
51
51
61
61
61
D
– Height of pellet suction system
in
55
55
55
63
63
73
73
73
F
– Height of suction filling unit
in
12
12
12
12
12
12
12
12
T
– Depth of boiler casing
in
32
32
32
34 1/4
34 1/4
39
39
39
V
– Depth of burner casing
in
20
20
20
20
20
20
20
20
E
– Flue gas tube connection height
in
25 1/2
25 1/2
25 1/2
33 1/4
33 1/4
41
41
41
A
– Height of suply/return
in
35 3/4
35 3/4
35 3/4
43 3/4
43 3/4
52
52
52
R
– Diameter of flue gas tube
in
5
5
5
6
6
7
7
7
Boiler Weight
Boiler size
PE(S)
12
PE(S)
15
PE(S)
20
PE(S)
25
PE(S)
32
PE(S)
36
PE(S)
48
PE(S)
56
Weight of boiler packaged on pallet
with wooden frame
Lb
858
858
858
1003
1003
1430
1430
1430
Weight of boiler with casing, hopper
and burner
Lb
631
631
631
756
756
1120
1120
1120
Weight of boiler without casing,
hopper and burner
Lb
529
529
529
664
664
930
930
930
Minimum clearance dimensions required
Note:
To install the heating system properly and ensure economical operation, you need to make sure that minimum
clearance dimensions indicated below are observed when setting up the boiler.
In addition, make sure that
legislation in your country is complied with relating to the minimum clearance of the flue gas tube.
a
Min. clearance of flue gas connection
inch
18
b
Min. clearance of side of boiler
inch
5
c
Min. clearance of front of boiler
inch
28
d
Min. clearance of side of burner
inch
12
e
Min. ceiling height
inch
80
Note:
Place the boiler according to the minimum
clearances to the flue tube connection piece as
defined in NFPA 31 (distance of 18”).
Make sure that you also comply with local legal
regulations.
For clearances required for floor protection, see
following page.
PE 3671 USA 2.3
Installation Manual PES 36–56
Содержание Pellematic PES 12-20
Страница 38: ...Connecting up to the power supply 38 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 46: ...Connecting up to the power supply 46 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 47: ...Connecting up to the power supply 47 PE 3671 USA 2 3 Installation Manual PES 36 56...
Страница 52: ...Operating the pellet boiler 52 Setting date and time Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 88: ...Appendix 88 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 92: ...Appendix 92 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 99: ...Appendix 99 Labeling 105x74 PE 3671 USA 2 3 Installation Manual PES 36 56...
Страница 100: ......