Bringing the pellet boiler into the boiler room
24
7.5 Removing the casing, the hopper and the burner
Dismantle the pellet boiler as far as necessary if site conditions require, so that the unit can be brought safely into
the building.
The complete dismantling of all components described here is divided into the following sections:
1.
Dismantling the burner casing
2.
Dismantling the hopper
3.
Dismantling the burner
4.
Dismantling the boiler door
5.
Dismantling the boiler casing
7.5.1 Dismantling the burner casing
Installation Manual PES 36–56
PE 3671 USA 2.3
Содержание Pellematic PES 12-20
Страница 38: ...Connecting up to the power supply 38 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 46: ...Connecting up to the power supply 46 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 47: ...Connecting up to the power supply 47 PE 3671 USA 2 3 Installation Manual PES 36 56...
Страница 52: ...Operating the pellet boiler 52 Setting date and time Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 88: ...Appendix 88 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 92: ...Appendix 92 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 99: ...Appendix 99 Labeling 105x74 PE 3671 USA 2 3 Installation Manual PES 36 56...
Страница 100: ......