Appendix
90
17. switch
OFF
the boiler again
18. plug in the plug
ES BSK
19. switch
ON
the boiler
20. go to
Pellematic
21. push the button
Enter
22. go to
Pellematic CMP
23. push the button
Enter
24. go to
Pellematic 1
25. push the button
Enter
26. once more — push the button
Enter
27. the date and the time is displayed – please note the first two numeric from the date and the two numeric from the
time. Sum this numeric and note it – you need ist for step number 30 “Code”.
28. go to
Parameter 199
29. push the button
Enter
30. enter in the
Code
31. push the button
Enter
32. go to
Parameter 298
33. push the button
Enter
34. set up the number from
0
to
1
35. push the button
Enter
Note:
The number gets back to
0
– that`s o.k.
36. push the button
ESC
37. the boiler is running on the right software version.
Installation Manual PES 36–56
PE 3671 USA 2.3
Содержание Pellematic PES 12-20
Страница 38: ...Connecting up to the power supply 38 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 46: ...Connecting up to the power supply 46 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 47: ...Connecting up to the power supply 47 PE 3671 USA 2 3 Installation Manual PES 36 56...
Страница 52: ...Operating the pellet boiler 52 Setting date and time Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 88: ...Appendix 88 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 92: ...Appendix 92 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 99: ...Appendix 99 Labeling 105x74 PE 3671 USA 2 3 Installation Manual PES 36 56...
Страница 100: ......