Connecting up to the power supply
39
10.2 Plugs on the boiler controller
The designation of the plugs must correspond with the labeling of plug-in positions.
Designation of the plug-in
position
Voltage
Name of sensors, motors and pumps
KF
8 9
24 Volt
Boiler sensor
UP
2 3 4
24 Volt
Negative draft measuring
AE2
5 6 7
24 Volt
Analog-input 2
FRT
+12 13
24 Volt
Combustion chamber sensor (optional)
RGF
+14 15
24 Volt
Flue gas sensor
BR1
7 8
24 Volt
Burner contact
AK
11 12
24 Volt
Existing boilers
ES_AV
32 33 34
24 Volt
End switch ash box
DE1
37 36 35
24 Volt
Not used
KAP_ZW
5 4 3
24 Volt
Capacitive Sensor – hopper
KAP_RA
5 4 3
24 Volt
Capacitive sensor – burner (only for auger system)
BSK
6 5 4 3 2 1
24 Volt
Fire protection – motor
ES_BSK
25 26
24 Volt
Fire protection – end switch
LUFT
11 PE N
230 Volt
Burner fan
ES
6 PE N 3 2 1
230 Volt
Burner motor
ZUEND
22 PE N
230 Volt
Ignition
MA
47 PE 48
230 Volt
Magnetic valve (only for condensing boiler)
Netz
PE N 1
230 Volt
Power supply
SPL
46 PE N
230 Volt
Vacuum suction system – relay board
RA
16 15 14 PE N
230 Volt
Fuel transport system – motor
ZW
16 15 14 PE N
230 Volt
Suction turbine
RES 1
49 PE 50
230 Volt
Motor hopper – PES 36–56 only
RES 2
53 PE 54
230 Volt
Boiler controlled pump
AV
51 PE 52
230 Volt
Motor ashbox
UW
N PE 13
230 Volt
Not used
SZ
N PE 17
230 Volt
Flue gas fan
RM
N PE 15
230 Volt
Motor boiler cleaning device
SM
20 19
dry contact
Fault signal relay (max. 5 A)
SI2
60 61
230 Volt
Not used
TUEB
13 14
230 Volt
Not used
STB
19 PE 17
230 Volt
Safety temperature sensor
NOT
43 41
230 Volt
Emergency stop heating, USA: Low water cut off
WR1
4 PE N
230 Volt
Power supply external heating controller
WR2
B A GND 24 V
24 Volt
Operating display
WR3
GND 24V B A
24 Volt
Pelletronic heating controller
EWB
A B GND
24 Volt
Not used
PE 3671 USA 2.3
Installation Manual PES 36–56
Содержание Pellematic PES 12-20
Страница 38: ...Connecting up to the power supply 38 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 46: ...Connecting up to the power supply 46 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 47: ...Connecting up to the power supply 47 PE 3671 USA 2 3 Installation Manual PES 36 56...
Страница 52: ...Operating the pellet boiler 52 Setting date and time Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 88: ...Appendix 88 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 92: ...Appendix 92 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 99: ...Appendix 99 Labeling 105x74 PE 3671 USA 2 3 Installation Manual PES 36 56...
Страница 100: ......