Starting up for the first time
61
Description of parameter
Para-
meter
Display on screen
Description
Adjus
table
Factory
setting
P100
Exit
P100: Enter
Standard display:
• Press ENTER once — displays boiler temperature
• Press ENTER again — displays day, date, time, version of
PLC program and power rating setting.
yes
P101
Serial number
P101: 00081
Serial number of CMP controller.
no
P104
Continuous mode
P104: Enter
Pressing ENTER activates the continuous operation function.
First of all the fire protection system on the burner opens the
fire protection flap (BSK) – this process takes approx. 2 min.
The burner motor then runs continuously, transporting pellets
to the burner plate.
The pellet auger also runs continuously on heating systems
fitted with an auger fuel transport system.
P105
Boiler temp.
P105: 145°F
Current boiler temperature
no
P106
Flue gas temp.
P106: 242°F
Current flue gas temperature
no
P107
AGT/FRT temp.
P107: 1009°F
Combustion chamber temperature (displayed only if NiCrNi
flame sensor is connected)
no
P109
Controller temp.
P109: 73°F
Current temperature of boiler controller circuit board
no
P110
Cap. hopper
P110: 0
Capacitive sensor on hopper:
0 = material available
1 = no material available
Note:
Displayed on vacuum-type conveyor systems
Optional on auger-type systems
no
P111
Cap. burner
P111: 2
Capacitive sensor on burner:
2 = material available
0 = no material available
no
P112
Burner starts
P112: 345x
Number of system burner starts
no
P113
Burner run time
P113: 3562h
Burner run time in hours
no
P114
Average run time
P114: 127m
Average run time per burner start
no
P115
Downtime
P115: 3267m
Time expired since last burner stop. This value also applies
to the boiler being switched off intermittently. The maximum
value is 65000 min
no
P116
Run time
P116: 96zs
Run time of burner auger in tenths of a second.
no
P117
Rest time
P117: 80zs
Rest time of burner auger in tenths of a second.
no
P118
Current air flow
rate P118: 39%
Burner fan power in percent.
no
PE 3671 USA 2.3
Installation Manual PES 36–56
Содержание Pellematic PES 12-20
Страница 38: ...Connecting up to the power supply 38 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 46: ...Connecting up to the power supply 46 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 47: ...Connecting up to the power supply 47 PE 3671 USA 2 3 Installation Manual PES 36 56...
Страница 52: ...Operating the pellet boiler 52 Setting date and time Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 88: ...Appendix 88 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 92: ...Appendix 92 Installation Manual PES 36 56 PE 3671 USA 2 3...
Страница 99: ...Appendix 99 Labeling 105x74 PE 3671 USA 2 3 Installation Manual PES 36 56...
Страница 100: ......