![Manitowoc 140.5.204 Скачать руководство пользователя страница 639](http://html.mh-extra.com/html/manitowoc/140-5-204/140-5-204_operation-manual_701123639.webp)
Push and hold the lever up
Push and hold the lever down
The left front outrigger cylinder is
extended.
The left front outrigger cylinder is
retracted.
Push and hold the lever up
Push and hold the lever down
The right front outrigger cylinder is
extended.
The right front outrigger cylinder is
retracted.
9.7.2.1.6 Lifting the machine
Data
Value Unit
A
550 mm
A
21.6 in
B
3600 mm
B
141.0 in
Extend/retract left front outrigger
cylinder
Extend/retract right front outrigger
cylinder
Overview: Lifting height of the out-
rigger cylinders
Transport
27.04.2020
140.5.204 Telescopic crane
639
Fo
r
Reference
Only
Содержание 140.5.204
Страница 69: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 69 F o r R e f e r e n c e O n l y ...
Страница 70: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 70 F o r R e f e r e n c e O n l y ...
Страница 87: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 87 F o r R e f e r e n c e O n l y ...
Страница 88: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 88 F o r R e f e r e n c e O n l y ...