![Manitowoc 140.5.204 Скачать руководство пользователя страница 636](http://html.mh-extra.com/html/manitowoc/140-5-204/140-5-204_operation-manual_701123636.webp)
1
Bolt in fastening position P1
1.
Remove the bolt from fastening position P1.
2.
Tilt and hold downward the
[Extend/retract rear left outrigger cylinder]
lever until the out-
rigger cylinder has reached fastening position P2.
1
Bolt in fastening position P2
3.
Mount and secure the bolt in fastening position P2.
4.
Tilt and hold downward the
[Extend/retract rear left outrigger cylinder]
lever until the out-
rigger cylinder is fully retracted.
5.
Repeat these steps to change the fastening position of the
remaining outrigger cylinders from P1 to P2.
Changing the fastening position of
the outrigger cylinders from P1 to
P2
Transport
27.04.2020
140.5.204 Telescopic crane
636
Fo
r
Reference
Only
Содержание 140.5.204
Страница 69: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 69 F o r R e f e r e n c e O n l y ...
Страница 70: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 70 F o r R e f e r e n c e O n l y ...
Страница 87: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 87 F o r R e f e r e n c e O n l y ...
Страница 88: ...Safety instructions 27 04 2020 140 5 204 Telescopic crane 88 F o r R e f e r e n c e O n l y ...