METHOD FOR CHECKING OIL LEVEL IN SWING MACHINERY CASE, ADDING
OIL
k
k
WARNING
Immediately after the engine is stopped, its parts and oil are still very hot, and may cause burn injury.
Wait for the temperature to go down, and then start the work.
1.
Remove the dipstick (G) and wipe off oil on it with a cloth.
2.
Insert the dipstick (G) fully into the dipstick pipe.
3.
Pull out the dipstick (G) and check that the oil level is be-
tween the (H) and (L) marks on the dipstick.
If the oil level is below (L) mark, add oil through the oil filler
port (F).
4.
If the oil level is above the mark (H) of dipstick (G), install
the hose (1) which has been stored in the toolbox to the
drain valve (P) on the lower side of the machine. Loosen
the drain valve (P) slowly to drain the excessive oil.
5.
After checking the oil level or adding the oil, insert the dip-
stick (G) into the dipstick pipe.
METHOD FOR CHECKING OIL LEVEL IN PTO GEAR CASE, ADDING OIL
k
k
WARNING
Immediately after the engine is stopped, its parts and oil are still very hot, and may cause burn injury.
Wait for the temperature to go down, and then start the work.
NOTICE
Park the machine on a flat ground and stop the engine. When more than 30 minutes elapse after stop-
ping the engine, check the oil level.
MACHINE OPERATIONS AND CONTROLS
OPERATION
3-142
Содержание PC700LC-11
Страница 2: ......
Страница 23: ...LOCATION OF SAFETY LABELS 5 SAFETY SAFETY LABELS 2 3...
Страница 66: ......
Страница 67: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1...
Страница 73: ...REMARK The above figure does not show all of the caution lamp symbols OPERATION GENERAL VIEW 3 7...
Страница 316: ......
Страница 317: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1...
Страница 331: ...Fuel main fil ter cartridge Replace Replace Replace Replace MAINTENANCE MAINTENANCE SCHEDULE 4 15...
Страница 375: ...A Important inspection part F Front Revolving frame Center frame MAINTENANCE MAINTENANCE PROCEDURE 4 59...
Страница 396: ......
Страница 397: ...SPECIFICATIONS 5 1...
Страница 401: ...For 7 6m Boom SPECIFICATIONS SPECIFICATIONS 5 5...
Страница 402: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Страница 426: ......
Страница 427: ...REPLACEMENT PARTS 7 1...
Страница 434: ......
Страница 442: ...PC700LC 11 HYDRAULIC EXCAVATOR Form No UENAM01321 2017 KOMATSU All Rights Reserved Printed in Belgium 09 2017...