2.
Place the attachment on a horizontal place, install pin (A)
and then pin (B) in this order to the arm.
3.
Lower the attachment to the ground and stop the engine.
4.
Turn the starting switch to ON (B) position.
5.
Set the lock lever to FREE position (F).
6.
Operate each work equipment control lever and attach-
ment control pedal fully to the front, rear, right, and left a
few times within 15 seconds to release the internal pres-
sure in the hydraulic circuit.
HANDLE MACHINE READY FOR INSTALLATION OF ATTACHMENT
ATTACHMENTS AND OPTIONS
6-46
Содержание PC210-11
Страница 2: ......
Страница 24: ......
Страница 74: ......
Страница 75: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1 ...
Страница 352: ......
Страница 353: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 ...
Страница 431: ...SPECIFICATIONS 5 1 ...
Страница 435: ...PC210LC 11 PC210NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Страница 436: ...PC230NHD 11 SPECIFICATIONS SPECIFICATIONS 5 6 ...
Страница 458: ...PC210 11 2 Piece Boom PC210LC 11 2 Piece Boom PC210NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 22 ...
Страница 459: ...PC230NHD 11 2 Piece Boom ATTACHMENTS AND OPTIONS 2 PIECE BOOM 6 23 ...
Страница 470: ... Not including tail swing SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 34 ...
Страница 505: ...REPLACEMENT PARTS 7 1 ...
Страница 521: ......