5.
Align the pin hole of arm (1) with replacement bucket hole
(2), then align the pin hole of link (3) with hole (4), and in-
stall pins (A) and (B) which are coated with grease.
REMARK
When inverting, do not install O-rings. Keep them until the next use.
6.
Install the stopper bolts and nuts for each pin, then grease the pins.
REMARK
• Lubricate with grease thoroughly until the grease comes out from the end faces.
• When replacing the bucket, replace the dust seal with a new one if it is damaged. If a damaged one is
used without being replaced, sand and dirt may enter the part of pin and cause abnormal wear of the
pin.
OPERATION
MACHINE OPERATIONS AND CONTROLS
3-209
Содержание PC210-11
Страница 2: ......
Страница 24: ......
Страница 74: ......
Страница 75: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1 ...
Страница 352: ......
Страница 353: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 ...
Страница 431: ...SPECIFICATIONS 5 1 ...
Страница 435: ...PC210LC 11 PC210NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Страница 436: ...PC230NHD 11 SPECIFICATIONS SPECIFICATIONS 5 6 ...
Страница 458: ...PC210 11 2 Piece Boom PC210LC 11 2 Piece Boom PC210NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 22 ...
Страница 459: ...PC230NHD 11 2 Piece Boom ATTACHMENTS AND OPTIONS 2 PIECE BOOM 6 23 ...
Страница 470: ... Not including tail swing SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 34 ...
Страница 505: ...REPLACEMENT PARTS 7 1 ...
Страница 521: ......