5.
Pull out projections (2) (6 places) on the back of the floor
mat and remove the floor mat.
6.
Remove the cap from water drain hole (3).
7.
Flush out the dirt on the floor directly with water through
water drain hole (3).
8.
After completing the washing work, install the cap in water
drain hole (3).
9.
Fit the floor mat and secure it by inserting projections (2)
into the holes.
METHOD FOR SETTING MACHINE AT ANGLE
You can set the machine at an angle by using a slope or blocks. Consider the condition of the machine and
select the safe method.
METHOD FOR USING SLOPE
k
k
WARNING
Select a solid and smooth slope.
Always block the tracks from movement, and thrust the work equipment into the ground.
1.
Stop the machine with the work equipment on the downhill side on a slope.
2.
Block the tracks from movement and thrust the work
equipment into the ground.
MAINTENANCE PROCEDURE
MAINTENANCE
4-34
Содержание PC210-11
Страница 2: ......
Страница 24: ......
Страница 74: ......
Страница 75: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1 ...
Страница 352: ......
Страница 353: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 ...
Страница 431: ...SPECIFICATIONS 5 1 ...
Страница 435: ...PC210LC 11 PC210NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Страница 436: ...PC230NHD 11 SPECIFICATIONS SPECIFICATIONS 5 6 ...
Страница 458: ...PC210 11 2 Piece Boom PC210LC 11 2 Piece Boom PC210NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 22 ...
Страница 459: ...PC230NHD 11 2 Piece Boom ATTACHMENTS AND OPTIONS 2 PIECE BOOM 6 23 ...
Страница 470: ... Not including tail swing SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 34 ...
Страница 505: ...REPLACEMENT PARTS 7 1 ...
Страница 521: ......