Applicable operations
7
Quarry work or digging bedrock
N
8
Lifting
N
* Work allowed only with specialist cutting basket.
METHOD OF WORK
• Avoid operating the bucket cylinder and arm cylinder to the end of their stroke.
• Use the maximum specific gravity 1.8 t/m
3
• Take care when using the super long front machine on soft ground. Ensure the ground has sufficient
strength to support the weight of the machine with loaded bucket before commencing operations.
• Where possible, avoid using the super long front machine on slopes.
• Do not use this equipment for compacting slope faces.
• When travelling, lower the boom, pull in the arm, keep the work equipment parallel to the track and travel
slowly.
• Do not use any bucket with a capacity greater than shown in this table.
Buckets which do not conform to this table must not be used.
Item
Unit
PC210LC-11 15m
Max digging radius
mm
1200
General Purpose Bucket, material density 1.8 t/m
3
•
Capacity (ISO)
m
3
0.49
•
Maximum Width
mm
955
•
Maximum Weight
kg
425
General Purpose Bucket, material density 1.2 t/m
3
•
Capacity (ISO)
m
3
0.66
•
Maximum Width
mm
955
•
Maximum Weight
kg
525
Powered attachment
•
Maximum Weight at the end of the arm
kg
800
Bucket
•
Maximum Weight at the end of the arm
kg
1300
Ditching Bucket, material density 1.5 t/m
3
•
Maximum Width
mm
2100
Values shown are in accordance with EN474-5:2006+A1:2009 (E)
k
k
WARNING
Do not use any attachment which imposes vibration loading onto the equipment.
k
k
CAUTION
The Super Long Front machine is not to be used for lifting.
SUPER LONG FRONT BOOM AND ARM
ATTACHMENTS AND OPTIONS
6-26
Содержание PC210-11
Страница 2: ......
Страница 24: ......
Страница 74: ......
Страница 75: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1 ...
Страница 352: ......
Страница 353: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 ...
Страница 431: ...SPECIFICATIONS 5 1 ...
Страница 435: ...PC210LC 11 PC210NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Страница 436: ...PC230NHD 11 SPECIFICATIONS SPECIFICATIONS 5 6 ...
Страница 458: ...PC210 11 2 Piece Boom PC210LC 11 2 Piece Boom PC210NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 22 ...
Страница 459: ...PC230NHD 11 2 Piece Boom ATTACHMENTS AND OPTIONS 2 PIECE BOOM 6 23 ...
Страница 470: ... Not including tail swing SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 34 ...
Страница 505: ...REPLACEMENT PARTS 7 1 ...
Страница 521: ......