PREPARATIONS FOR MOVING MACHINE
Prepare for moving the machine according to the following procedure.
1.
Set swing lock switch (1) to ON (actuated) position and
check that the swing lock pilot lamp (2) is lit.
(a): ON position
(b): OFF position
2.
Turn fuel control dial (3) to High idle (MAX) position.
Increase the engine speed.
METHOD FOR TRAVELLING FORWARD
1.
Set lock lever (4) to FREE position (F).
Set the work equipment in the travel posture and raise it to
40 to 50 cm .
• If the work equipment blocks the view and it is difficult
to travel safely, raise the work equipment further.
2.
Operate right and left travel levers (5) or right and left trav-
el pedals (6) as follows:
3.
Check the position of the sprocket.
• When sprocket (A) is at the rear of the machine:
Start the machine either by pushing levers (5) forward
slowly or by depressing the front parts of pedals (6)
slowly.
OPERATION
MACHINE OPERATIONS AND CONTROLS
3-189
Содержание PC210-11
Страница 2: ......
Страница 24: ......
Страница 74: ......
Страница 75: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1 ...
Страница 352: ......
Страница 353: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 ...
Страница 431: ...SPECIFICATIONS 5 1 ...
Страница 435: ...PC210LC 11 PC210NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Страница 436: ...PC230NHD 11 SPECIFICATIONS SPECIFICATIONS 5 6 ...
Страница 458: ...PC210 11 2 Piece Boom PC210LC 11 2 Piece Boom PC210NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 22 ...
Страница 459: ...PC230NHD 11 2 Piece Boom ATTACHMENTS AND OPTIONS 2 PIECE BOOM 6 23 ...
Страница 470: ... Not including tail swing SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 34 ...
Страница 505: ...REPLACEMENT PARTS 7 1 ...
Страница 521: ......