7.
If the machine is equipped with work equipment, set the
work equipment at the front, and travel forward to load it; if
it has no work equipment, travel in reverse to load it.
Follow instructions and signals of a conductor particularly
when travelling in reverse.
8.
Before moving the machine onto the ramps, make sure
that the machine is positioned in a straight line with the
ramps and that the centerline of the machine matches that
of the trailer.
9.
Set the travel direction toward the ramps and drive slowly.
Lower the work equipment as far as possible without caus-
ing interference.
On the ramps, operate only the travel lever. Do not operate
any other lever.
10. When loading a machine with the work equipment instal-
led, at the point where the tracks are on both the ramps
and the ground surface, turn the swing lock switch OFF.
11. Swing the upper structure slowly 180 °.
12. Turn the swing lock switch ON to apply the swing lock.
When the swing lock switch is turned to ON position, swing
lock pilot lamp (9) lights up.
(a): ON position
(b): OFF position
TRANSPORTATION
OPERATION
3-246
Содержание PC210-11
Страница 2: ......
Страница 24: ......
Страница 74: ......
Страница 75: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1 ...
Страница 352: ......
Страница 353: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 ...
Страница 431: ...SPECIFICATIONS 5 1 ...
Страница 435: ...PC210LC 11 PC210NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Страница 436: ...PC230NHD 11 SPECIFICATIONS SPECIFICATIONS 5 6 ...
Страница 458: ...PC210 11 2 Piece Boom PC210LC 11 2 Piece Boom PC210NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 22 ...
Страница 459: ...PC230NHD 11 2 Piece Boom ATTACHMENTS AND OPTIONS 2 PIECE BOOM 6 23 ...
Страница 470: ... Not including tail swing SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 34 ...
Страница 505: ...REPLACEMENT PARTS 7 1 ...
Страница 521: ......