1
Boom
2
Arm
3
Bucket
4
Bucket link
WORKING MODES
The table gives an indication of the type of work and method of use recommended. Please follow these recom-
mendations.
Type of work
R - Recommended work
C - Work requiring caution
N - Work that is not permitted
Applicable operations
1
Dredge rivers (specific gravity max 1.8)
R
2
Hauling, loading dry sand (specific gravity max 1.8)
R
3
Digging, hauling piled soil (specific gravity max 1.8)
R
4
Cutting and removing weeds
R*
5
Digging clay layers
C
6
Digging bank
C
ATTACHMENTS AND OPTIONS
SUPER LONG FRONT BOOM AND ARM
6-25
Содержание PC210-11
Страница 2: ......
Страница 24: ......
Страница 74: ......
Страница 75: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1 ...
Страница 352: ......
Страница 353: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 ...
Страница 431: ...SPECIFICATIONS 5 1 ...
Страница 435: ...PC210LC 11 PC210NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Страница 436: ...PC230NHD 11 SPECIFICATIONS SPECIFICATIONS 5 6 ...
Страница 458: ...PC210 11 2 Piece Boom PC210LC 11 2 Piece Boom PC210NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 22 ...
Страница 459: ...PC230NHD 11 2 Piece Boom ATTACHMENTS AND OPTIONS 2 PIECE BOOM 6 23 ...
Страница 470: ... Not including tail swing SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 34 ...
Страница 505: ...REPLACEMENT PARTS 7 1 ...
Страница 521: ......