METHOD FOR CHECKING ACCUMULATOR FUNCTION
k
k
CAUTION
When performing the inspection, check first that there is no person or obstacle in the surrounding area.
Check the nitrogen gas charge pressure as follows.
1.
Place the machine on a flat ground.
2.
Hold the work equipment in the maximum reach posture
(arm fully OUT, bucket fully DUMP) at height (A) 1.5 m
from the ground.
3.
Perform the following procedure within 15 seconds.
After the engine stops, the accumulator pressure decreases gradually. You can check only just after the en-
gine stops.
1) Keep the work equipment at the maximum reach pos-
ture, turn the starting switch to OFF position (A), and
stop the engine.
2) Turn the starting switch to ON position (B).
3) With the lock lever at FREE position (F), operate the
work equipment control levers fully in LOWER direc-
tion and check that the work equipment is lowered to
the ground.
MAINTENANCE PROCEDURE
MAINTENANCE
4-66
Содержание PC210-11
Страница 2: ......
Страница 24: ......
Страница 74: ......
Страница 75: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1 ...
Страница 352: ......
Страница 353: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 ...
Страница 431: ...SPECIFICATIONS 5 1 ...
Страница 435: ...PC210LC 11 PC210NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Страница 436: ...PC230NHD 11 SPECIFICATIONS SPECIFICATIONS 5 6 ...
Страница 458: ...PC210 11 2 Piece Boom PC210LC 11 2 Piece Boom PC210NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 22 ...
Страница 459: ...PC230NHD 11 2 Piece Boom ATTACHMENTS AND OPTIONS 2 PIECE BOOM 6 23 ...
Страница 470: ... Not including tail swing SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 34 ...
Страница 505: ...REPLACEMENT PARTS 7 1 ...
Страница 521: ......