7.
Pass wire ropes between the 1st and 2nd track rollers from
the front and between the 1st and 2nd track rollers from
the rear.
However, for machines equipped with full roller guards for
the track rollers, pass the wire ropes under the tracks.
When the wire rope contacts with the edge of the machine,
put wooden block or backing metal between them.
8.
Set the lifting angle (A) of the wire rope to 30 to 40 °, then
sling the machine slowly.
9.
After the machine comes off the ground, check the hook
condition and the lifting posture, and then sling the ma-
chine upward slowly.
OPERATION
TRANSPORTATION
3-261
Содержание PC210-11
Страница 2: ......
Страница 24: ......
Страница 74: ......
Страница 75: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1 ...
Страница 352: ......
Страница 353: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 ...
Страница 431: ...SPECIFICATIONS 5 1 ...
Страница 435: ...PC210LC 11 PC210NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Страница 436: ...PC230NHD 11 SPECIFICATIONS SPECIFICATIONS 5 6 ...
Страница 458: ...PC210 11 2 Piece Boom PC210LC 11 2 Piece Boom PC210NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 22 ...
Страница 459: ...PC230NHD 11 2 Piece Boom ATTACHMENTS AND OPTIONS 2 PIECE BOOM 6 23 ...
Страница 470: ... Not including tail swing SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 34 ...
Страница 505: ...REPLACEMENT PARTS 7 1 ...
Страница 521: ......