13. Before starting the work, check that fuel control dial (4) is
at a 2/3 position between Low idle (MIN) position and High
idle (MAX) position.
If it is not at a 2/3 position, set it to the 2/3 position and run
the engine at 2/3 speed between MIN and MAX before op-
erating.
14. Before starting actual work, repeat the following operation 3 to 5 times.
Circulate warm hydraulic oil through all control circuits.
• Boom operation: RAISE (E) ←→ LOWER (F)
• Arm operation: IN (B) ←→ OUT (A)
• Bucket operation: CURL (D) ←→ DUMP (C)
• Swing operation: LEFT (G) ←→ RIGHT (H)
When performing swing operations, release swing
lock switch (2), check that the swing lock pilot lamp is
OFF, then operate the swing.
• Travel (Lo) operation: FORWARD (A) ←→ REVERSE
(B)
• For attachment operations (if equipped), change the
working mode to the attachment mode.
MACHINE OPERATIONS AND CONTROLS
OPERATION
3-184
Содержание PC210-11
Страница 2: ......
Страница 24: ......
Страница 74: ......
Страница 75: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1 ...
Страница 352: ......
Страница 353: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1 ...
Страница 431: ...SPECIFICATIONS 5 1 ...
Страница 435: ...PC210LC 11 PC210NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Страница 436: ...PC230NHD 11 SPECIFICATIONS SPECIFICATIONS 5 6 ...
Страница 458: ...PC210 11 2 Piece Boom PC210LC 11 2 Piece Boom PC210NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 22 ...
Страница 459: ...PC230NHD 11 2 Piece Boom ATTACHMENTS AND OPTIONS 2 PIECE BOOM 6 23 ...
Страница 470: ... Not including tail swing SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 34 ...
Страница 505: ...REPLACEMENT PARTS 7 1 ...
Страница 521: ......