1-10 Setup
TOS9200/9201
9.
Following the opening screen, display the ACW screen and con
fi
rm that
the tester is kept in the READY status.
The above steps complete the checking procedure.
Connecting the interlock jumper
1.
Insert a screwdriver into A to open B.
2.
Insert the interlock jumper into B. Con
fi
rm that the cable shield is not
caught in the jumper.
3.
By lightly pulling on the jumper, con
fi
rm that it is connected securely.
4.
Take the same steps for the positive (+) and negative (-), then short-cir-
cuit both sides.
Fig.1-7Connecting the jumper
A
B
Shank diameter:
φ
3; tip width: 2.6 mm
10 mm
Содержание TOS9200
Страница 22: ...P 10 Preface TOS9200 9201...
Страница 116: ...3 78 Basic Operations TOS9200 9201...
Страница 130: ...4 14 Using Terminals and Connectors TOS9200 9201...
Страница 148: ...7 4 Maintenance TOS9200 9201...
Страница 162: ...8 14 Specifications TOS9200 9201...
Страница 170: ...I 4 Index TOS9200 9201...
Страница 171: ......