P-4
Preface
TOS9200/9201
Fig.P-5
IR Measurement Range
■
Full
y pr
ogrammab
le GPIB and RS-232C interfaces as a
standar
d f
eature
All functions e
xcept for the PO
WER switch, KEYLOCK, and program e
x
ecute
(A
UT
O) functions, are remote-controllable.
T
est conditions such as the test v
oltage,
judgement v
alue, and test time can be controlled remotely in
A
C and DC withstand
-
ing v
oltage and insulation resistance tests. Measured v
alues and measurement
results can also be read back by remote control.
The GPIB and RS-232C interf
aces
pro
vided as a standard feature smoothly interf
ace the tester with a PC, sequencer
,
and other de
vices.
■
Fle
xib
le contr
ol function realiz
ed b
y a high-v
olta
ge
scanner
When combined with the optional high-v
oltage scanner
T
OS9220 (5 kV
A
C/6
kVDC), the
T
OS9200/9201 can test multiple points in withstanding v
oltage and
insulation resistance tests. Using the
T
OS9200/T
OS9201 panel, each channel can be
set to a HI/LO/OPEN v
oltage. One scanner can operate up to four channels. Up to
four scanners can be connected to the
T
OS9200/9201, enabling the simultaneous
operation of a total of 16 channels.
The
T
OS9221 is equipped with a function for
detecting connections between the high-v
oltage test leadwire and the DUT
, thus
ensuring highly reliable testing.
■
Rise-time contr
ol function
In
A
C withstanding v
oltage testing, DC withstanding v
oltage testing, and insulation
resistance testing, a v
oltage can be slo
wly increased until it reaches a required test
v
alue, instead of applying the required test v
oltage to the DUT immediately after the
start of a test.
The v
oltage rise time can be set to 0.1 s through 99.9 s at a resolution
of 0.1 s, and to 100 s through 200 s at a resolution of 1 s.
The start v
oltage, which is
applied at the start of a test, can be set to 0 % to 99 % of the test v
oltage at a resolu
-
tion of 1 %.
Thus, the
T
OS9200/T
OS9201 conforms to the requirement for the type
certi
fi
cation test under the UL standard and the withstanding v
oltage test under the
IEC standard that less than half of the test v
oltage be applied initially and slo
wly
increased for a speci
fi
ed period of time before the test v
oltage is reached.
1
10
100
1000
0.01
0.1
1
10
100
1000
10000
Resistance[M
Ω
]
Voltage[V]
Содержание TOS9200
Страница 22: ...P 10 Preface TOS9200 9201...
Страница 116: ...3 78 Basic Operations TOS9200 9201...
Страница 130: ...4 14 Using Terminals and Connectors TOS9200 9201...
Страница 148: ...7 4 Maintenance TOS9200 9201...
Страница 162: ...8 14 Specifications TOS9200 9201...
Страница 170: ...I 4 Index TOS9200 9201...
Страница 171: ......