U3606A Multimeter|DC Power Supply
User’s and Service Guide
5
Verification and Performance Tests
Recommended Test Equipment 140
General measurement techniques 143
Using an electronic load 143
Connecting the current monitoring resistor 144
Zero offset verification test setup 146
Gain verification test setup 147
Output verification test setup 148
Verification and Performance Tests Overview 153
Performance Verification Tests 155
Zero offset verification test 155
Gain verification test 157
Output verification test 162
Optional capacitance gain verification test 172
Optional square-wave output verification test 173
Additional Verification Tests 172
This chapter contains the procedures for verification of the instrument
performance. The input connections and test setup for each verification
procedure is also described in this chapter.
Содержание U3606A
Страница 1: ...Keysight U3606A Multimeter DC Power Supply User s and Service Guide ...
Страница 2: ......
Страница 12: ...12 U3606A User s and Service Guide ...
Страница 128: ...3 DC Power Supply Operation Remote Sensing 106 U3606A User s and Service Guide ...
Страница 160: ...4 System Related Operation Remote Operation 138 U3606A User s and Service Guide ...
Страница 198: ...5 Verification and Performance Tests Additional Verification Tests 176 U3606A User s and Service Guide ...
Страница 242: ...6 Calibration Procedures Adjustments procedures 220 U3606A User s and Service Guide ...
Страница 291: ...List of Error Messages 9 Error Messages U3606A User s and Service Guide 269 ...