5
Verification and Performance Tests
Input Connections
146
U3606A User’s and Service Guide
Input Connections
Test connections to the instrument are best accomplished by using the
dual banana plug with copper wire short between the two terminals for
low- thermal offset measurement.
Shielded, twisted- pair PTFE interconnecting cables of minimum length are
recommended between the calibrator and the U3606A. Cable shields
should be earth ground referenced.
This configuration is recommended for optimal noises and settling time
performance during calibration.
Zero offset verification test setup
Figure 5-1
Test setup for zero offset (short) verification
Connect the
shorting plug
to the
V
and
LO
terminals
Содержание U3606A
Страница 1: ...Keysight U3606A Multimeter DC Power Supply User s and Service Guide ...
Страница 2: ......
Страница 12: ...12 U3606A User s and Service Guide ...
Страница 128: ...3 DC Power Supply Operation Remote Sensing 106 U3606A User s and Service Guide ...
Страница 160: ...4 System Related Operation Remote Operation 138 U3606A User s and Service Guide ...
Страница 198: ...5 Verification and Performance Tests Additional Verification Tests 176 U3606A User s and Service Guide ...
Страница 242: ...6 Calibration Procedures Adjustments procedures 220 U3606A User s and Service Guide ...
Страница 291: ...List of Error Messages 9 Error Messages U3606A User s and Service Guide 269 ...