Verification and Performance Tests
5
Performance Verification Tests
U3606A User’s and Service Guide
167
3
Set the output voltage to the full rated value (30 V for S1 range) and
current to full scale.
4
Connect an additional electronic load across the front panel
(red)
and
(black) output terminals in parallel with a oscilloscope (see
).
5
Operate the electronic load in transient operation mode between one
half of the output full rated value and the output full rated value at a
1 Hz rate with 50% duty cycle.
6
Set the oscilloscope for DC coupling, internal synchronization, and lock
on either the positive or negative load transient.
7
Adjust the oscilloscope to display transients as shown in
Note that the pulse width (t
2
– t
1
) of the transients at 50 mV from the
base line should be no more than 450 ms for the output.
Figure 5-13
Load transient response time
Содержание U3606A
Страница 1: ...Keysight U3606A Multimeter DC Power Supply User s and Service Guide ...
Страница 2: ......
Страница 12: ...12 U3606A User s and Service Guide ...
Страница 128: ...3 DC Power Supply Operation Remote Sensing 106 U3606A User s and Service Guide ...
Страница 160: ...4 System Related Operation Remote Operation 138 U3606A User s and Service Guide ...
Страница 198: ...5 Verification and Performance Tests Additional Verification Tests 176 U3606A User s and Service Guide ...
Страница 242: ...6 Calibration Procedures Adjustments procedures 220 U3606A User s and Service Guide ...
Страница 291: ...List of Error Messages 9 Error Messages U3606A User s and Service Guide 269 ...