7
Disassembly and Repair
Operating Checklist
222
U3606A User’s and Service Guide
Operating Checklist
Before returning your instrument to Keysight for service or repair, do a
check on the following items:
Is the instrument inoperative?
?
Verify that the power cord is connected to the instrument and to the
AC line power.
?
Verify that the front- panel power switch has been pushed.
?
Verify that the power- line fuse is installed and not open.
?
Verify the power- line voltage setting.
Does the instrument fail self- test?
?
Remove all test connections to the instrument and run the self- test
again.
Errors may be induced by AC signals present on the input terminals
of the instrument during the self- test. Long test leads can act as an
antenna causing pick- up of AC signals.
?
Remove all load connections to the output terminals.
Ensure that all terminal connections are removed while the self- test
is performed.
Is the instrument current input inoperative?
?
Verify the current input fuse.
Содержание U3606A
Страница 1: ...Keysight U3606A Multimeter DC Power Supply User s and Service Guide ...
Страница 2: ......
Страница 12: ...12 U3606A User s and Service Guide ...
Страница 128: ...3 DC Power Supply Operation Remote Sensing 106 U3606A User s and Service Guide ...
Страница 160: ...4 System Related Operation Remote Operation 138 U3606A User s and Service Guide ...
Страница 198: ...5 Verification and Performance Tests Additional Verification Tests 176 U3606A User s and Service Guide ...
Страница 242: ...6 Calibration Procedures Adjustments procedures 220 U3606A User s and Service Guide ...
Страница 291: ...List of Error Messages 9 Error Messages U3606A User s and Service Guide 269 ...