ICP 4030 iMC-P
49
/71
January
2018
If, when starting the isel control software ProNC or Remote, the message
indicates that maintenance is required, perform the following maintenance activities
7.4
Maintenance activities
The following tasks must be carried out at the end of a maintenance interval:
•
Visual inspection of the lubricating film on the
ball screw and steel
shaft guide
through the sealing lips of the linear axes X, Y and Z
•
if necessary, re-lubrication (see section Lubrication points)
•
Visual inspection of
chips and impurities within the linear axes
through the sealing lips, suction and cleaning if necessary
•
Visual inspection of
impurities and chips within the tool
changer unit
through assembly opening, suction and
cleaning if necessary
Further maintenance work is:
when required: Cleaning of the interior from impurities acoustic control
of unusual noise development
2 months
Visual inspection of linear units - wear and tear
Visual inspection of toothed belt reversals in the Z-axis for pre-
tensioning and abrasion
1 year
Toothed belt replacement in the Z-axis
Check that the linear guides and ball screws are free of play (circularity
test in all planes by Renishaw measurement)
Toothed belt in the Z axis:
see parts list of the linear units in Chapter
17.1 Axis structure
Содержание ICP 4030 iMC-P
Страница 39: ...ICP 4030 iMC P 38 71 January 2018 7 Open processing programme here the NCP file Isel ncp ...
Страница 40: ...ICP 4030 iMC P 39 71 January 2018 Result text view ...
Страница 41: ...ICP 4030 iMC P Result graphic view 40 71 January 2018 8 for safety sake reference Z axis ...
Страница 59: ...ICP 4030 iMC P 14 Exploded views spare parts lists Fig 4 Exploded view ICP 4030 DU8000 58 71 January 2018 ...
Страница 61: ...ICP 4030 iMC P 69 71 January 2018 14 1 Structure axis systems X Axis ...
Страница 63: ...62 71 January 2018 ICP 4030 iMC P Y axis ...