Service Terminal Setup and 2105 Configuration Verification
The service terminal is the service support representatives primary interface to the 2105 storage
subsystem. The service terminal is connected to a cluster bay by the service support representative at the
time of service.
Getting Started
The 2105 storage facility can have one, two, or three racks. All configurations require one 2105 Model
Exx/Fxx control unit rack. The service terminal connects only to cluster bay 1 or cluster bay 2 in the 2105
Model Exx/Fxx rack. The service terminal must be able to emulate an IBM 3151 ASCII terminal via a serial
interface connection.
Preparing the Service Terminal for Use With the 2105
1. Open the front cover of the 2105 Model Exx/Fxx.
2. Press the latches on the front service terminal table
1
and pull the table out until it stops.
3. Place the notebook PC service terminal on the pullout service terminal table and connect the AC
adapter cable and the service terminal interface cable to the service terminal (9-pin connector).
4. Connect the AC adapter to the utility power cord in the front tailgate area.
Note: Always operate the service terminal from AC power because the duration of the service activity
may exceed the capacity of the service terminal battery.
5. Switch service terminal power on.
6. Determine if the service terminal is running an OS/2 or a Windows operating system.
Is the service terminal running an OS/2 operating system?
v
Yes, go to step 7.
v
No, go to step 9 on page 55.
7. OS/2 Operating System: Determine if the service terminal is set up to run EBTERM in 2105 Direct
Connect Mode:
a. Double click on the EBTERM icon.
b. Single click on menu option Connect.
Front
View
Figure 62. Accessing the Service Terminal Table (S007635m)
Service Terminal Setup
54
VOLUME 3, ESS Service Guide
Содержание E10
Страница 2: ......
Страница 68: ...52 VOLUME 3 ESS Service Guide...
Страница 192: ...2105 Exception Symptom Codes 176 VOLUME 3 ESS Service Guide...
Страница 198: ...Translation 182 VOLUME 3 ESS Service Guide...
Страница 256: ...CPI Diagnostic Progress Code Stop 240 VOLUME 3 ESS Service Guide...
Страница 257: ...CPI Diagnostic Progress Code Stop Appendix C Isolating a CPI Diagnostic Progress Code Stop 241...
Страница 258: ...CPI Diagnostic Progress Code Stop 242 VOLUME 3 ESS Service Guide...
Страница 259: ...Glossary of Terms and Abbreviations Copyright IBM Corp 1999 2000 243...
Страница 277: ......
Страница 278: ...Printed in the United States of America on recycled paper containing 10 recovered post consumer fiber SY27 7609 06...
Страница 279: ...Spine information Enterprise Storage Server VOLUME 3 ESS Service Guide...