
Note: These labels cannot be ordered individually. If a label is missing, the 390 V battery set must
be replaced.
10. Verify that the ground jumpers are installed between each primary power supply (PPS) and the frame:
v
PPS 1,
17
v
PPS 2,
16
Note: There should be a star washer between the ground jumper terminals and the frame and PPS.
15
12
13
14
Rear View
2105 Expansion Enclosure
Figure 87. 2105 Expansion Enclosure 390 V Battery Set Safety Labels (S008399r)
2105 Expansion Enclosure Safety Inspection
206
VOLUME 3, ESS Service Guide
Содержание E10
Страница 2: ......
Страница 68: ...52 VOLUME 3 ESS Service Guide...
Страница 192: ...2105 Exception Symptom Codes 176 VOLUME 3 ESS Service Guide...
Страница 198: ...Translation 182 VOLUME 3 ESS Service Guide...
Страница 256: ...CPI Diagnostic Progress Code Stop 240 VOLUME 3 ESS Service Guide...
Страница 257: ...CPI Diagnostic Progress Code Stop Appendix C Isolating a CPI Diagnostic Progress Code Stop 241...
Страница 258: ...CPI Diagnostic Progress Code Stop 242 VOLUME 3 ESS Service Guide...
Страница 259: ...Glossary of Terms and Abbreviations Copyright IBM Corp 1999 2000 243...
Страница 277: ......
Страница 278: ...Printed in the United States of America on recycled paper containing 10 recovered post consumer fiber SY27 7609 06...
Страница 279: ...Spine information Enterprise Storage Server VOLUME 3 ESS Service Guide...