
11. Verify that the ground strap is fastened to the 2105 Expansion Enclosure frame with lock washers
between both cable terminals and the frame
18
.
Note: The ground strap may be fastened to the left side of the 2105 Expansion Enclosure frame in
the same position.
PPS 2
PPS 1
Rear View
16
17
2105 Expansion Enclosure
Figure 88. 2105 Expansion Enclosure, Primary Power Supply Ground Jumpers (S008376q)
2105 Expansion Enclosure Safety Inspection
Safety Check, CHAPTER 12
207
Содержание E10
Страница 2: ......
Страница 68: ...52 VOLUME 3 ESS Service Guide...
Страница 192: ...2105 Exception Symptom Codes 176 VOLUME 3 ESS Service Guide...
Страница 198: ...Translation 182 VOLUME 3 ESS Service Guide...
Страница 256: ...CPI Diagnostic Progress Code Stop 240 VOLUME 3 ESS Service Guide...
Страница 257: ...CPI Diagnostic Progress Code Stop Appendix C Isolating a CPI Diagnostic Progress Code Stop 241...
Страница 258: ...CPI Diagnostic Progress Code Stop 242 VOLUME 3 ESS Service Guide...
Страница 259: ...Glossary of Terms and Abbreviations Copyright IBM Corp 1999 2000 243...
Страница 277: ......
Страница 278: ...Printed in the United States of America on recycled paper containing 10 recovered post consumer fiber SY27 7609 06...
Страница 279: ...Spine information Enterprise Storage Server VOLUME 3 ESS Service Guide...