13. Complete the safety inspection by going to “Safety Engineering Changes” on page 208.
2105 Expansion Enclosure Safety Inspection
Safety inspect the 2105 Expansion Enclosure by doing the following procedures:
1. “Remove ac Power”
2. “External Machine Check” on page 198
3. “Internal Machine Check” on page 198
4. “Safety Label Check” on page 198
Remove ac Power
The 2105 Expansion Enclosure operates with two mainline power cables. Disconnect both mainline power
cables from the 2105 Expansion Enclosure before continuing.
Power off the entire 2105 subsystem, refer to
″
Rack, Subsystem Power, 2105 Model Exx/Fxx and
Expansion Enclosure
″
and
″
Mainline Power Cable, 2105 Model Exx/Fxx and Expansion Enclosure
″
in
chapter 4 of the Enterprise Storage Server Service Guide, Volume 2.
Follow these steps to remove ac power:
Rear View
2105 Model Exx/Fxx
PPS 2
PPS 1
16
17
Figure 79. 2105 Model Exx/Fxx, Primary Power Supply Ground Jumpers (S008825q)
2105 Model Exx/FxxSafety Inspection
Safety Check, CHAPTER 12
197
Содержание E10
Страница 2: ......
Страница 68: ...52 VOLUME 3 ESS Service Guide...
Страница 192: ...2105 Exception Symptom Codes 176 VOLUME 3 ESS Service Guide...
Страница 198: ...Translation 182 VOLUME 3 ESS Service Guide...
Страница 256: ...CPI Diagnostic Progress Code Stop 240 VOLUME 3 ESS Service Guide...
Страница 257: ...CPI Diagnostic Progress Code Stop Appendix C Isolating a CPI Diagnostic Progress Code Stop 241...
Страница 258: ...CPI Diagnostic Progress Code Stop 242 VOLUME 3 ESS Service Guide...
Страница 259: ...Glossary of Terms and Abbreviations Copyright IBM Corp 1999 2000 243...
Страница 277: ......
Страница 278: ...Printed in the United States of America on recycled paper containing 10 recovered post consumer fiber SY27 7609 06...
Страница 279: ...Spine information Enterprise Storage Server VOLUME 3 ESS Service Guide...