6-24
4) Tighten the special adjusting bolt.
Inspect and adjust the alternator belt (P. 3-29).
5) After adjustment, tighten the 8 mm flange nut and 10 x 80
mm flange bolt in this order to the specified torque.
TORQUE:
8 mm flange nut: 26 N.m (2.7 kgf.m, 20 lbf.ft)
10 x 80 mm flange bolt: 44 N.m (4.5 kgf.m, 33lbf.ft)
6) After tightening the nut and the bolt to the specified torque,
check the alternator belt tension and deflection (P. 3-29).
7) Connect the alternator 4P connector to the alternator
assembly.
8) Connect the alternator fuse cable to the alternator
assembly and loosely tighten the alternator B terminal
washer-nut.
9) Tighten the alternator B terminal washer-nut to the
specified torque so that the alternator fuse cable is
connected at 60˚ from the horizontal line as shown.
TORQUE: 8 N.m (0.8 kgf.m, 5.8 lbf.ft)
10) Install the following parts.
– Silencer duct (P. 6-4)
– Engine cover (P. 4-2)
[1] ALTERNATOR 4P CONNECTOR
[3] ALTERNATOR
FUSE CABLE
[2]
ALTERNATOR
B TERMINAL
WASHER-NUT
[3] ALTERNATOR
FUSE CABLE
[2]
ALTERNATOR B TERMINAL
WASHER-NUT
[1] 8 mm FLANGE
NUT
[2] SPECIAL
ADJUSTING
BOLT
[3]
ALTERNATOR ASSEMBLY
10 x 80
60°