14-76
17) Install the vertical shaft assembly with care not to let the
needle bearing roller come out of position.
18) Apply gear oil to the threads and seat of the 64 mm lock
nut, and tighten the lock nut using the special tool.
TOOL:
Lock nut wrench, 30/64 mm
07916-MB00002
TORQUE: 123 N.m (12.5 kgf.m, 90 lbf.ft)
19) Wipe the tapered part of the vertical shaft and pinion gear
with a shop towel and a degreasing cleaning solvent.
20) Attach the special tool to the end (crankshaft installation
side) of the vertical shaft as shown.
TOOL:
Vertical shaft holder
07SPB-ZW10200
21) Place a shop towel in the gear case as shown to protect the
gear case.
22) Apply gear oil to the threads and seat of the pinion gear
nut.
23) Tighten the pinion gear nut to the specified torque while
installing the pinion gear on the vertical shaft and holding
the special tool in position.
TORQUE: 142 N.m (14.5 kgf.m, 105 lbf.ft)
Check that the forward bevel gear/taper bearing assembly
is set properly.
24) Install the following parts.
– Propeller shaft holder assembly (P. 14-56)
– Water pump/shift rod (P. 14-51)
– Gear case assembly (P. 14-44)
– Propeller (P. 14-2)
NOTICE
[1]
LOCK NUT WRENCH,
30/64 mm
07916-MB00002
[2]
VERTICAL SHAFT
HOLDER
07SPB-ZW10200
[1]
VERTICAL SHAFT
[5]
GEAR CASE
[3]
PINION GEAR
NUT
[4]
SHOP TOWEL